Welcome to CIMC ENRIC

    LNG Storage & Re-gas

    The LNG storage and re-gas project is mainly used for peaking supply gas for the pipe line. And the project can also be used for deliver the LNG to the LNG, L-CNG station emergency supplement. With the excellent engineering and management team, Enric can provide the EPC service for customers. Now Enric has successfully built several LNG storage and re-gas project, the capacity is covered from 5,000m3 to 60,000m3.


    The feature of the project
    1. As a member of CIMC Group, to combine our group resources, our capability is including design, overall proposal, site construction, project operating & management, EPC package etc. Furthermore, we use less time to combine all resources for a project, so that we could always shorten the lead time and construction period.
    2. The outstanding feature of our facility is with high integration, the module manufacturing and installation could make our facility take less space and easily transported.
    3. With more scientific design and qualified manufacturing, our project system has high stability during operating, which makes less trouble to our customers.

  • Previous:
  • Next:
  • Please get in touch with us to discuss more about your specific requirements.

    Write your message here and send it to us

    Please get in touch with us to discuss more about your specific requirements.

    Write your message here and send it to us